We operate in harsh and unpredictable climates and locations where our access is regulated which could adversely impact our operations.
Some of our facilities are located in harsh and unpredictable climates and locations which can experience extreme weather conditions and natural disasters such as: sustained ambient temperatures above 40°C or below -35°C, flooding, droughts, wind and dust storms, difficult terrain, high seas, monsoons and hurricanes. These conditions are difficult to anticipate and cannot be controlled. In these conditions, operations can become difficult or unsafe and are often suspended. Some of our facilities and those upon which our facilities rely (such as pipelines, power, communications and oilfield equipment) are vulnerable to these types of extreme weather conditions and may suffer extensive damage as a result. If any such extreme weather were to occur, our ability to operate certain facilities and proceed with exploration or development programs could be seriously or completely impaired or destroyed, and could have a material adverse effect on our business, financial condition and results of operations. The insurance we maintain may not be adequate to cover our losses resulting from disasters or other business interruptions.
In some areas of the world, access and operations can only be conducted during limited times of the year due to weather or government regulation. These adverse conditions can limit our ability to operate in those areas and can intensify competition during periods of good weather for oil field equipment, services, and qualified personnel, which may lead to periodic shortages. These constraints and the resulting shortages or high costs could delay our operations and materially increase our operating and capital costs, and could have a material adverse effect on our business, financial condition and results of operations.
Exploration, development and production activities may not be successful and carry a risk of loss.
Acquiring, developing and exploring for oil and natural gas involves many risks. There is a risk that we will not encounter commercially productive oil or gas reservoirs, and that wells we drill may not be productive, or not sufficiently productive to recover all or any portion of our investment in those wells. Seismic data and other exploration technologies we use do not provide conclusive proof prior to drilling a well that crude oil or natural gas is present or may be produced economically. The costs of drilling, completing and operating wells are often uncertain, and drilling operations may be curtailed, delayed or canceled as a result of a variety of factors, including:
-
encountering unexpected formations or pressures;
-
blow-outs, well bore collapse, equipment failures and other accidents;
-
craterings and sour gas releases;
-
accidents and equipment failures;
-
uncontrollable flows of oil, natural gas or well fluids; and
-
environmental risks.
We may not achieve production targets should our reservoir production decline sooner than expected. Also, we operate two facilities that are located in close proximity to populated areas, and each processes materials of potential harm to the local populations. We may not be fully insured against all of these risks. Losses resulting from the occurrence of these risks may materially impact our operational activities and financial results.
Unconventional gas resource plays carry additional risks and uncertainties.
Part of Nexen’s growth strategy is unconventional Canadian gas resource plays, such as CBM and shale gas. Exploitation techniques and practices for these resources in Canada generally remain in the early stages of development and it is very difficult to determine whether or not these resource plays will prove commercially viable, or to what degree.
CBM is commonly referred to as an unconventional form of natural gas because it is primarily stored through adsorption by the coal itself rather than in the pore space of the rock like most conventional gas. The gas is released in response to a drop in pressure in the coal. Some of the uncertainties associated with development of CBM resources are as follows:
-
if the coalbed is water saturated, such as the Mannville coals in the Fort Assiniboine region of Alberta, water generally needs to be extracted to reduce the pressure and allow gas production to occur. A significant period of time may be required to dewater these wet coals and determine if commercial production is feasible. We may also have to invest significant capital in these assets before they achieve commercial rates of production, if ever;
-
some coalbeds may not have sufficient natural permeability in the coalbed to recover the gas in place and can therefore require more extensive, and expensive, completion technologies which can increase the cost of drilling and production;
-
the public may react negatively to certain water disposal practices related to water saturated CBM projects, even though these water disposal practices are regulated to ensure public safety and water conservation. Negative public perception around water saturated CBM production could impede our access to the resource;
-
CBM wells typically have lower producing rates and reserves per well than conventional gas wells, although this varies by area; and
-
regulatory approval is required to drill more than one well per section. As a result, the timing of drilling programs and land development can be uncertain.
Shale gas is an unconventional gas produced from reservoirs composed of organic rich shales. The gas is stored in pore spaces, fractures or adsorbed into organic matter. Some of the uncertainties associated with development of shale gas resources are as follows:
-
shale gas wells typically have higher production decline rates, lower producing rates and reserves per well than conventional gas wells, although this varies by area;
-
regulatory approval is required to drill more than one well per section. As a result, the timing of drilling programs and land development can be uncertain; and
-
shales are typically less permeable than conventional gas reservoirs, and can therefore require more extensive, and expensive, completion technologies which can increase the cost of drilling and production.
Our heavy oil production is more expensive and yields lower prices than light oil and gas.
Heavy oil is characterized by high specific gravity or weight and high viscosity or resistance to flow. Because of these features, heavy oil is more difficult and expensive to extract, transport and refine than other types of oil. Heavy oil also yields a lower price relative to light oil and gas, as a smaller percentage of high-value petroleum products can be refined from heavy oil. As a result, our heavy oil operations are exposed to the following risks:
-
additional costs may be incurred to purchase diluent to transport heavy oil;
-
there could be a shortfall in the supply of diluent which may cause its price to increase; and
-
the market for heavy oil is more limited than for light oil making it more susceptible to supply and demand fundamentals which may cause the price to decline.
Any one or a combination of these factors could cause some of our heavy oil properties to become uneconomic to produce and/or result in negative reserve revisions.
Without reserve additions, our reserves and production will decline over time and we require capital to produce remaining reserves.
Our future crude oil and natural gas reserves and production, and therefore our future operating cash flows and results of operations, are highly dependent upon our success in exploiting our current reserve base and acquiring or discovering additional reserves. Without reserve additions through exploration, development or acquisitions, our reserves and production will decline over time as reserves are produced. The business of exploring for, developing or acquiring reserves is capital intensive. To the extent cash flows from operations are insufficient and external sources of capital become limited or unavailable, our ability to make the necessary capital investments to maintain and expand our oil and natural gas reserves and production will be impaired.
Discovered oil and natural gas reserves are generally only produced when they are economically recoverable. As such, oil and gas prices, and capital and operating costs have an impact on whether reserves will ultimately be produced. As required by SEC rules, our proved reserves represent the quantities that we expect to economically recover using existing prices and costs at the end of the year. Proved reserves can increase or decrease under different price and cost scenarios. Our bitumen reserves are particularly sensitive to year-end prices and costs. Under current SEC rules, we are required to recognize our oil sands as bitumen reserves rather than the upgraded premium synthetic crude oil that we produce from the Long Lake Project. We expect price-related revisions, both positive and negative, to occur in the future as the economic producibility of our bitumen reserves are sensitive to year-end prices. We recognize our oil sands as bitumen reserves and they are related to one project. All or none of the reserves will likely be considered economic depending on the year-end prices for bitumen, diluent and natural gas, even though the Long Lake Project has minimal exposure to these factors.
Our proved reserves include undeveloped properties that require additional capital to bring them on stream.
Under SEC rules, the definition of proved undeveloped reserves includes reserves that are expected to be recovered from new wells on undrilled acreage or from existing wells where a relatively major expenditure is still required before such wells begin production. Reserves may be recognized when plans are in place to make the required investments to convert these undeveloped reserves to producing. Circumstances such as a sustained decline in commodity prices or poorer than expected results from initial activities could cause a change in the investment or development plans which could result in a material change in our reserves estimates. At December 31, 2008, 48% of our proved reserves before royalties (49% after royalties) were undeveloped. Refer to chapter Proved Undeveloped Reserves for information on our PUDs.
The Long Lake Project faces additional risks compared to conventional oil and gas production.
The Long Lake Project is a fully integrated production, upgrading and cogeneration facility. We use steam assisted gravity drainage (SAGD) technology to recover bitumen from oil sands. The bitumen is partially upgraded using the proprietary OrCrude™ process, followed by conventional hydrocracking to produce a sweet, premium synthetic crude oil. The OrCrude™ process also yields liquid asphaltenes that will be gasified into synthetic gas. This syngas is used as fuel for the SAGD process, a source of hydrogen in the upgrading process, and to generate electricity through a cogeneration facility.
We have a 65% working interest in this project. Given the initial investment and operating costs to produce and upgrade bitumen, the payout period for the project is longer and the economic return is lower than a conventional light oil project with an equal volume of reserves.
In addition to the risks associated with heavy oil production stated above, risks associated with our Long Lake Project include the following:
Application of Relatively New SAGD Bitumen Recovery Process
SAGD has been used in western Canada to increase recoveries from conventional heavy oil reservoirs for over a decade; however, application of SAGD to the insitu recovery of bitumen from oil sands is relatively new. Some of the SAGD oil sands applications to date have been pilot projects, although several commercial SAGD projects have been in steady state operation for over six years.
Our estimates for performance and recoverable volumes for the Long Lake Project are based primarily on our three well-pair SAGD pilot, the initial performance of our first commercial well phase, and industry performance from SAGD operations in like reservoirs in the McMurray formation in the Athabasca oil sands. Using this data, our assumptions included average well-pair productivity of 900 bbls/d of bitumen and a long-term steam-to-oil ratio of 3.0. While some of our wells have achieved these levels, there can be no certainty that our overall SAGD operation will produce bitumen at the expected levels or steam-to-oil ratio. If the assumed production rates or steam-to-oil ratio are not achieved, we might have to drill additional wells to maintain optimal production levels, construct additional steam generating capacity, purchase natural gas for additional steam generation, and/or make short-term bitumen purchases. These could have an adverse impact on the future activities and economic return of the Long Lake Project.
Application of New Bitumen Upgrading Process
The proprietary OrCrude™ process we are using to upgrade raw bitumen to synthetic crude is the first commercial application of the process although we have operated it in a 500 bbl/d demonstration plant and initial upgrader operations which began in January 2009 have produced the desired products. There can be no certainty that the commercial upgrader at Long Lake will sustain or achieve the results which are now being seen or forecast. If we are unable to continue to upgrade the bitumen for any reason we may decide to sell it as bitumen without upgrading, which would expose us to the following risks:
-
the market for bitumen is limited;
-
additional costs would be incurred to purchase diluent for blending and transporting bitumen;
-
there could be a shortfall in the supply of diluent which may cause its price to increase;
-
the market price for bitumen is relatively low reflecting its quality differential;
-
the market price for bitumen fluctuates over the course of the year; and
-
additional costs would be incurred to purchase natural gas for use in generating steam for the SAGD process since we would not be producing syngas from the upgrading process.
These factors could have a significant adverse impact on the future activities and economic returns of the Long Lake Project.
If any of these factors arise, our operating costs would increase and our revenues would decrease from those we have assumed. This would materially decrease expected earnings from the project and the project may not be profitable under these conditions.
Dependence upon Proprietary Technology
The success of the project and our investment depends highly on the proprietary technology of OPTI and proprietary technology of third parties that has been, or is required to be, licensed by OPTI. OPTI currently relies on intellectual property rights and other contractual or proprietary rights, including (without limitation) copyright, trademark laws, trade secrets, confidentiality procedures, contractual provisions, licenses and patents, to secure the rights to utilize its proprietary technology and the proprietary technology of third parties. OPTI may have to engage in litigation to protect the validity of its patents or other intellectual property rights, or to determine the validity or scope of patents or proprietary rights of third parties. Litigation can be time-consuming and expensive, whether OPTI is successful or not. The process of seeking patent protection can itself be long and expensive, with no assurance that any pending or future patent applications of OPTI or such third parties will actually result in issued patents, or that, if patents are issued, they will be of sufficient scope or strength to provide meaningful protection or any commercial advantage to OPTI. Others may develop technologies that are similar or superior to: 1) the technology of OPTI or third parties; or 2) the design around the patents owned by OPTI and/or third parties. There is also a risk that OPTI may not be able to enter into licensing arrangements with third parties for additional technologies required to possibly further expand the Long Lake upgrader.
Operational Hazards
The operation of the project is subject to the customary hazards of recovering, transporting and processing hydrocarbons, such as fires, explosions, gaseous leaks, migration of harmful substances, blowouts and oil spills. A casualty occurrence might result in the loss of equipment or life, as well as injury or property damage. We may not carry insurance with respect to all potential casualty occurrences and disruptions, and our insurance may not sufficiently cover casualty occurrences or disruptions that occur. The project could be interrupted by natural disasters or other events beyond our control. Losses and liabilities arising from uninsured or under-insured events could have a material adverse effect on the project and on our business, financial condition and results of operations.
Recovering bitumen from oil sands and upgrading the recovered bitumen into synthetic crude oil and other products involve particular risks and uncertainties. The project is susceptible to loss of production, slowdowns or restrictions on its ability to produce higher-value products due to the interdependence of its component systems. Severe climatic conditions can cause reduced production and in some situations result in higher costs. SAGD bitumen recovery facilities and development and expansion of production can entail significant capital outlays. The costs associated with synthetic crude oil production are largely fixed and, as a result, operating costs per unit depend largely on production levels.
The Long Lake Project processes large volumes of hydrocarbons at high pressure and temperatures and will handle large volumes of high-pressure steam. Equipment failures could result in damage to the project’s facilities and liability to third parties against which we may not be able to fully insure or may elect not to insure because of high premium costs or for other reasons.
Certain components of the Long Lake Project produce sour gas, which is gas containing hydrogen sulphide. Sour gas is a colourless, corrosive gas that is toxic at relatively low levels to plants and animals, including humans. The project includes integrated facilities for handling and treating the sour gas, including the use of gas sweetening units, sulphur recovery systems and emergency flaring systems. Failures or leaks from these systems or other exposure to sour gas produced as part of the project could result in damage to other equipment, liability to third parties, adverse effect to humans, animals and the environment, or the shutdown of operations.
The Long Lake Project produces carbon dioxide emissions. Risk factors relating to environmental regulation are provided separately in this document.
Aboriginal Claims
Aboriginal peoples have claimed aboriginal title and rights to a substantial portion of western Canada. Certain aboriginal peoples have filed a claim against the Government of Canada, the Province of Alberta, certain governmental entities and the regional municipality of Wood Buffalo (which includes the city of Fort McMurray, Alberta) claiming, among other things, aboriginal title to large areas of lands surrounding Fort McMurray, including the lands on which the project and most of the other oil sands operations in Alberta are located. Such claims, if successful, could have a significant adverse effect on the Long Lake Project and on us.
Some of our production is concentrated in a few producing assets.
A significant portion of our production is generated from highly productive individual wells or central production facilities. Examples include:
-
Scott and Buzzard production platforms in the North Sea;
-
central processing facilities, oil pipelines, and export terminal at our Yemen operations;
-
our Long Lake synthetic crude oil operations; and
-
upgrading facilities at Syncrude in the Athabasca oil sands.
As significant production is generated from each asset, any single event that interrupts one of these operations could result in the loss of production.
Our energy marketing operations expose us to the risk of trading losses and liquidity constraints.
Our trading operations expose us to the risk of financial losses from various sources which may have a material and adverse effect on our financial performance. The commodity markets in which we trade have experienced unanticipated volatility relative to historical variances, resulting in unusual and significant pricing changes, and deviations from anticipated seasonal pricing trends and pricing levels. Our energy marketing division maintains a trading portfolio comprised of both long and short physical and financial positions which may be at any time significant in size or number, and which are predicated on a trading thesis for expected pricing levels and trends in forward or regional markets. Unanticipated volatility in the commodity price level and trends upon which those trading positions are based may cause those positions to decrease in value.
Significant changes in the commodities and financial markets could require us to provide additional liquidity if additional collateral is required to be placed with counterparties, or reduce some of our activities. Adverse credit-related events such as a downgrade of our credit rating to non-investment grade could require additional collateral to be placed with counterparties. Adverse credit-related events could also negatively affect trading counterparties who fail to fulfill their contractual obligations.
The transportation and storage assets and contracts owned by our energy marketing business may decrease in value due to changes in temporal and regional commodity pricing.
Use of marine transportation may expose us to the risk of financial loss and damaged reputation.
From time to time, we may choose to charter marine vessels for the transportation of crude oil. This may expose us to the risk of financial loss and damaged reputation in the event of oil spills.